The CWMF variation lifecycle, governed clause by clause.

Post-award is where public works projects lose cost certainty. GovIQ tracks every variation from anticipated forecast to ER determination, runs the statutory threshold tests, and stops a 50% ceiling breach before it reaches OGP Legal.

Variation lifecycle

From anticipated to determined — every state mapped to CWMF mechanics.

App D

Anticipated

Forecast, no PI issued

Cl. 10.4

PI Issued

Proposed Instruction sent

Quoted / Evaluated

Contractor quote, DT valued

Cl. 10.5

ER Determined

Determination issued — locked

Clause references tagged on every variation: 10.3 contractor claim · 10.4 ER proposed instruction · 10.5 ER determination · 10.6 compensation event.

Threshold engine

T1–T7: the variation tests that keep an award defensible.

Every variation runs against the three-state model — Determined, Forecast and Anticipated Final Cost. Each test consumes a specific state, so a forecast warning never gets confused with a binding breach.

TestTriggerAction on breach
T1 — single variation > 5% contract sumDeterminedRequire AND approval
T2 — cumulative > 10%DeterminedRequire AND approval
T3 — cumulative > 15% (EU de minimis)DeterminedAND + Legal + C&E joint review
T4 — cumulative > 50% (statutory ceiling)DeterminedHard block — OGP Legal route to override
T5 — AFC > approved capital budgetAFCCapital re-approval at original threshold
T6 — AFC crosses capital bandAFCCapital re-approval at the new threshold
T7 — variation crosses OGP bandDeterminedRe-procurement risk warning

A live Proximity Engine warns as a draft value is typed — Green under 80% of the nearest threshold, through to Red as it approaches the statutory ceiling.

What it covers

The whole post-award picture, in one record.

Employer's claims & EOTs

Extension-of-time applications and employer's claims with the 20-day response clock and escalation built in.

Monthly cost reports

Immutable snapshots generated to the CWMF / healthcare template — Cover, Dashboard, App A–D, cashflow — never edited in place.

Three-state rollups

Determined, anticipated and forecast cumulative totals recomputed on every status change. They are not the same number.

Risk register

Contract risk tracked alongside the variation pipeline so anticipated cost is never a surprise.

Works programme

Programme and practical-completion targets tracked against actuals.

Contractor external access

A fair, transparent, scoped view for the contractor — submissions and certificates, audit-stamped.

Get started

See the variation engine stop a breach in real time.

A 12-minute walkthrough on a worked healthcare example.